The Point
3MG
The crane has been used daily on this project to set forms, allowing us to complete multiple pours each week.
Not every tank includes a divider wall, but this one does.
Deck pour
At The Point, the deck is poured in a checkerboard pattern rather than monolithically, as project constraints require the concrete to be placed in separate sections.
Shoring supports the deck while we pour and as the concrete is curing. After the deck reaches strength we will strip the shoring from inside the tank and lift it out with our crane or boom truck.